SRF Pine Ave Force Main Extension

Construct approximately 10,500 LF of 16-inch fusible PVC/HDPE force main via directional drilling, modify Pump Station 2, and decommission the South WWTF. Proposals due September 3, 2026. Contact Jason Laurenza at (904) 297-7036.

City of Green Cove Springs FL

Categories

Boring/directional drilling Sewer collection system / mains Wastewater lift / pump stations

Important dates

  • Published

  • Pre-proposal conference

    Virtual or in-person; details to be provided by the city.

  • Questions due

    Submit via the procurement portal.

  • Submission deadline

    Deadline passed

AI overview

The City of Green Cove Springs is soliciting bids for the SRF Pine Ave Force Main Extension project, a wastewater infrastructure improvement initiative. The project involves constructing approximately 10,500 linear feet of 16-inch fusible PVC (or alternate HDPE) force main using directional drilling methods, along with modifications to Pump Station 2 collection system and limited activities to decommission the South Wastewater Treatment Facility. This work is part of the city's efforts to enhance wastewater conveyance and treatment capacity.

Key dates include a pre-proposal conference on August 4, 2026 at 3:00 PM ET, a Q&A deadline on August 31, 2026 at 4:00 PM ET, and a final proposal deadline on September 3, 2026 at 7:00 PM ET. The solicitation is issued under number 2026-3 and is administered through the city's OpenGov procurement portal. All inquiries should be directed to Jason Laurenza, Engineering Technician, at jlaurenza@greencovesprings.com or (904) 297-7036.

Interested contractors must submit their proposals electronically via the procurement portal. Required attachments include the Bid Set Plans, Bid Set Specifications, and the Bid Table, all available for download. The project requires bid security, payment and performance bonds, and compliance with the scope of work, procedures, and additional requirements outlined in the solicitation documents. The force main will be installed via horizontal directional drilling (HDD), necessitating expertise in underground utility construction.

This project is funded through the State Revolving Fund (SRF) program and is critical to the city's wastewater master plan. Successful completion will improve system reliability and allow for the decommissioning of an older treatment facility. The lowest responsive and responsible bidder meeting all specifications will be considered for award.

Resources & contact

Proposal Document

View proposal document

Solicitation number

2026-3

Contact

Unlock Full Access to Utility Proposals

You're viewing past opportunities. Start a free trial to see active RFPs right now, filter by your utilities, and get real-time alerts — no credit card required.

Sign Up Free

Already have an account? Log in