Switchgear Replacement Building 30 at DLA Distribution San Joaquin CA DDJC
DLA Distribution San Joaquin is seeking a contractor to replace the Building 30 substation and related switchgear at its California facility. The contractor must provide all labor, supervision, materials, tools, and equipment per the SOW and specifications. The solicitation closed on August 31, 2023.
Categories
Important dates
-
Published
-
Submission deadline
Deadline passed
AI overview
Bid Abstract Posted SEE ATTACHMENT Bid Abstract 23B0004 ******Amendment 0002 is being issue to Revise Bid Opening to August 31, 2023 at 3:00 PM eastern standard time. SEE ATTACHMENT SP330023B00040002 ******Amendment 0001 is being issued to answer a vendor question. SEE ATTACHMENT SP330023B00040001 See Solicitation Attached as "SP330023B0004 FINAL.PDF" Note: The following project description is for the purpose of general information and is not intended to include and describe every feature or item or to define the scope of work. PROJECT DESCRIPTION: This project will consist of providing all labor, supervision, materials, tools, and equipment to the �Building 30 Switchgear Replacement� project. The project includes the following work: The work includes Contractor is to provide all labor, supervision, materials, tools, and equipment to replace building 30 Substation and related Switchgear per SOW and specifications. SEE ATTACHMENTS
Resources & contact
Proposal Document
View proposal documentSolicitation number
SP3300-23-B-0004
Contact
- Paul J. Holbert
- paul.holbert@dla.mil
Unlock Full Access to Utility Proposals
You're viewing past opportunities. Start a free trial to see active RFPs right now, filter by your utilities, and get real-time alerts — no credit card required.
Already have an account? Log in