TCEC ISO-Phase Bus Preventative Maintenance
FMPA is seeking preventative maintenance services for ISO-Phase bus equipment at utility facilities, including inspection, testing, cleaning, and lubrication to extend asset life and prevent critical failures. Contractors must demonstrate hands-on experience with high-voltage electrical equipment and ISO-Phase bus systems specifically. Work will be evaluated on technical approach, safety protocols, qualifications, and ability to minimize facility downtime during maintenance.
Important Dates
Deadline
1 days remaining
Published
AI Overview
This Request for Proposal (RFP) seeks qualified contractors to provide preventative maintenance services for ISO-Phase bus equipment at the TCEC (Tampa Electric Company or similar utility cooperative) facility. The work encompasses inspection, testing, and maintenance of ISO-Phase bus systems to ensure reliable operation and extend asset life through proactive maintenance practices.
The scope of work includes comprehensive preventative maintenance services for ISO-Phase bus infrastructure, which may include cleaning, inspection of bus components, testing of electrical systems, lubrication of moving parts, and identification of potential issues before they become critical failures. Contractors must demonstrate experience with high-voltage electrical equipment maintenance and ISO-Phase bus systems specifically.
Proposers are required to submit detailed technical proposals outlining their maintenance methodology, equipment and tools to be utilized, safety protocols, and project timeline. The evaluation will consider contractor qualifications, experience with similar projects, technical approach, pricing, and ability to minimize downtime during maintenance activities.
This opportunity is administered through the FMPA (Florida Municipal Power Agency) portal and represents a joint purchasing project for member utilities. Interested contractors should review the complete RFP document for detailed requirements, specifications, submission instructions, and evaluation criteria.
Resources & Contact
Posting URL
View Original Posting