Villa Substation Oil Containment
Oil containment construction at Villa Substation (1978-era facility) to comply with EPA Title 40 CFR Part 112; proposal deadline March 7, 2023 at 7:00 PM in Pasadena, CA.
Important Dates
Deadline
Deadline passed
Published
AI Overview
The project provides for the construction of an oil containment system at Villa Substation to prevent mineral oil spills from transformers and electrical equipment from affecting the environment. The work is required to bring the 1978-constructed substation into compliance with Federal Environmental Protection Agency regulations under Title 40 (Protection of Environment), Code of Federal Regulations (CFR), Part 112 (Oil Pollution Prevention).
Construction work includes sawcutting and removal of the existing concrete pad; excavation, backfill, soil compaction, testing and shoring where required; installation of reinforced concrete pipe, reinforced concrete trench with grates, and reinforced concrete structures; hauling, provision of safety devices, demolition, and cleanup. The project also includes miscellaneous appurtenant work and all required demolition and safety measures.
Key Project Dates: Pre-Proposal Meeting scheduled for February 7, 2023 at 6:00 PM. Questions and Answers deadline is February 21, 2023 at 7:00 PM. Proposals must be submitted by March 7, 2023 at 7:00 PM. The procurement follows the Labor & Materials (Competitive Bidding PMC 4.08.045) template and includes standard federal compliance requirements including HUD Federal Packages, Section 3 provisions, lobbying disclosures, and non-collusion declarations.
Bidders must provide Material and Labor Bond Forms, Faithful Performance Bond Forms, Relevant Experience Forms, subcontractor listings, and comply with all insurance requirements and federal terms and conditions as outlined in the complete bid package.
Resources & Contact
Posting URL
View Original PostingSolicitation Number
2022-IFB-LM-224