W912PM24B0008 - PN97470 - Construct Microgrid at Fort Liberty, NC
The US Army Corps of Engineers – Wilmington District invites bids to construct a microgrid on the JSOC compound at Fort Liberty, NC, including a new 2 MW diesel generator, medium voltage transformers, switchgear, distribution cable, duct-banks, and a fuel supply system. Bids due September 30, 2024.
Categories
Important dates
-
Published
-
Bid opening
EDT
-
Submission deadline
Deadline passed
AI overview
This project will install a new two-megawatt diesel generator on the JSOC compound, at Fort Liberty, NC. The existing generator controls and electrical distribution infrastructure are to be expanded to allow the new generator to be synchronized with the four existing generators. Project shall install new medium voltage transformers, switchgear, distribution cable, duct-banks, breakers, equipment for communications and controls, a new fuel supply system consisting of fuel tanks, and a polishing system. All work is to be performed in accordance with the attached specifications, drawings, and contract provisions. * Amendment 0008 updates CLIN 0002 of the solicitation to add the directed sub-contract amount of $15,869,743.95.** NOTE: Amendment 0009 changes the required response date/time has changed from 23-Jul-2024 01:00 PM to 24-Jul-2024 01:00 PM. The bid opening will take place 24-Jul-2024 02:00 PM EDT. The Amendment also clarifies Amendment 0008 effective date is July 19, 2024.Bid Abstract and Sign-In Sheet Posted
Resources & contact
Proposal Document
View proposal documentSolicitation number
W912PM24B0008
Contact
- ROBERT LAW
- robert.n.law@usace.army.mil
- 9102514469