Expired RFP

Well Motor Control Center Replacement

City of Geneva Public Works is replacing Well No. 6's motor control center with a new main disconnect and control cabinet, including panel board upgrades to current standards. Three addenda have modified the original scope—review all technical documents and specifications carefully before bidding.

City of Geneva IL

Categories

Distribution Construction & Field Services Substation maintenance

Important dates

  • Published

  • Submission deadline

    Deadline passed

AI overview

The City of Geneva Public Works Department is soliciting bids for the removal of the Well No. 6 motor control center and its replacement with a main disconnect and well control cabinet. The project scope includes updating the existing panel board to meet current standards and specifications. All work must be completed in accordance with the detailed bid specifications and plans provided by the city.

The project includes removal of existing equipment, installation of new main disconnect and control cabinet components, and panel board upgrades. Bidders must review all related documents including the bid specifications, project plans, and all addenda (three addenda have been issued) to understand complete scope requirements and any modifications to the original specifications.

This is a competitively bid project open to qualified contractors. Interested parties should carefully review all technical documents and contact the project superintendent with any questions regarding scope, specifications, or requirements before submitting their bid.

Resources & contact

Proposal Document

View proposal document

Solicitation number

354

Contact

Unlock Full Access to Utility Proposals

You're viewing past opportunities. Start a free trial to see active RFPs right now, filter by your utilities, and get real-time alerts — no credit card required.

Sign Up Free

Already have an account? Log in